PhD and MSc Theses
PhD and MSc Theses, since 1988
Student’s Name |
Graduation Year |
Degree |
Abstracts |
Research Name |
Ben-David Albert |
2018 |
PhD |
Abstracts |
Equipment and Site Logistics Planning as Critical Success Factors for Multicrane Building Construction Projects |
Opher Tamar |
2017 |
PhD |
Abstracts |
A Multi-Objective LCA-Based Model for Sustainability Assessment of Urban Water Reuse Alternatives at Various Centralization Scales |
Raviv Gabriel |
2016 |
PhD |
Abstracts |
Modeling of Near Misses Related to Crane Work at Construction Sites and their Safety Risk Potential |
Nir-Goldenberg Sigal |
2013 |
PhD |
Abstracts |
Dynamic Delineation and Multi-Criteria Evaluation of Green Landscape Corridor Alternatives |
Brodetskaia Irina |
2012 |
PhD |
Abstracts |
Implementation of Lean Principles for Real-Time Stabilization of Flow in Construction Operations |
Telem Dory |
2005 |
PhD |
Abstracts |
The Work of Construction Project Managers – Its Characteristics and Implications for the Principles of Managing Projects in a Dynamic Environment |
Vikinski Omer |
2023 |
MSc |
Abstracts |
Out-of-Service Tower Crane Motion Analysis and Investigation of Jib Rotation Damping Methods |
Elbaz Avihu |
2017 |
MSc |
Abstracts |
Investigation of Tower Crane Cycle Times: Cab-Control Versus Remote-Control Operation |
Goldner Marom Shiran |
2016 |
MSc |
Abstracts |
Culture of Using Tower Cranes for Building Construction |
Mazuz Ofer |
2016 |
MSc |
Abstracts |
Measurement and analysis of lateral pressure of concrete on vertical formwork using geotechnical tools |
Wicnudel Amit |
2012 |
MSc |
Abstracts |
Laser Scanning Based Modeling of Construction Sites for Tower Crane Blind-Lift Analysis |
Latner Erez |
2012 |
MSc |
Abstracts |
Applying the Analytic Hierarchy Process for the Selection of General Contractors for Construction Projects |
Raviv Gabriel |
2012 |
MSc |
Abstracts |
Identification and Analysis of Mechanisms for Constructability Knowledge Transfer from Contractors to Designers |
Yona Efraim |
2011 |
MSc |
Abstracts |
Factors Affecting the Selection of Forming Systems and other Major Equipment for Multistory Building Construction |
Partouche Rebecca |
2010 |
MSc |
Abstracts |
A Lean Model for Construction Management of Tall Office/Commercial Buildings |
Simcha Meir |
2006 |
MSc |
Abstracts |
Quantitative-Comparative Evaluation of Safety Risk at Construction Sites with Tower Cranes |
Lyachin Beniamin |
2004 |
MSc |
Abstracts |
Detection and Analysis of Safety Hazards at Construction Sites with Tower Cranes |
Goldenberg Marat |
2003 |
MSc |
Abstracts |
Analytic-Hierachy-Process-Based Model for Equipment Selection in Construction Project |
Shriki Mordechay |
2003 |
MSc |
Abstracts |
Investigation of Tower-Crane Cycle Times as a Basis for Productivity Improvement in Construction Projects |
Raz Yoram |
2001 |
MSc |
|
Comparative Analysis of Shoring-Tower-Based Support Systems for Concrete Elements |
Shchorri Yoram |
2000 |
MSc |
|
Rebar Constructability System |
Goldfinger Dov |
1996 |
MSc |
|
Model for Determining Assembly and Dismantling Work Inputs Of High Shoring Towers |
Goren Yitzhak |
1993 |
MSc |
|
The Duration of Construction Projects |
Gilad Jonathan |
1993 |
MSc |
|
Production and Ereltion of Portable |